Virar-alibaug Multimodal Corridor Route Map ✪

: It connects with NH-8 (Mumbai-Ahmedabad), NH-3 (Agra-Delhi), NH-4 (Pune-Bangalore), and the Mumbai-Pune Expressway. Infrastructure Synergy : Provides faster access to the Navi Mumbai International Airport Mumbai Trans Harbour Link (MTHL) Environment Clearance Portal Project Phases & Specifications The project is being developed in two main phases:

The 126-km project is divided into two main phases to streamline construction: Phase 1 (Navghar to Balavali): virar-alibaug multimodal corridor route map

, this access-controlled expressway acts as a vital outer ring road, bypassing heavily congested urban centers to link the northern outskirts of Virar directly to the southern coastal hub of Alibaug. Blackridge Research & Consulting Strategic Route and Alignment The corridor traverses through three major districts: Palghar, Thane, and Raigad . It is being developed in two distinct phases: Blackridge Research & Consulting Phase 1 (96.41 km): Extends from (near Virar) to It is being developed in two distinct phases:

| Symbol / Color | Meaning | |----------------------|---------------------------------------| | | VAMC main alignment (6/8 lane) | | Blue dashed line | Proposed rail/metro along the median | | Black dots | Toll plazas (5–6 planned) | | Green patches | Eco-sensitive zones (tunnel/viaduct) | | Yellow stars | Major interchanges | | Orange circles | Truck stops / logistics parks | : It connects with NH-8 (Mumbai-Ahmedabad)